Artemis Gold Inc (ARTG) Mining Data
TSXV: ARTG · Gold, Silver · Production stage
- Market cap$8.84B
- Share price$37.59
- 52-week range$29.13 – $48.80
- Shares outstanding235,150,370
- ExchangeTSXV
- Websitewww.artemisgoldinc.com
- Company Overview
- Interactive Economic Study
- Mining Data
- News
- Financials
- Management Team
- Insider Sales
- SEDAR+ Filings
Artemis Gold Inc mineral properties
No mineral properties are on file for this company yet.
Artemis Gold Inc drill result releases
1 drill result release from Artemis Gold Inc, read by Mining News Terminal, newest first.
| Date | Company | Project | Hole | Best intercept | Intervals | Release |
|---|---|---|---|---|---|---|
| 2026-08-20 | Artemis Gold Inc (ARTG) | Blackwater | BWDD-26-0001 | 1.22 g/t Au / 259m | 55 | Artemis Gold Intercepts Significant Mineralization in First Two Diamond Drill Holes in Resource Expansion Program at Blackwater, Including 85m at 2.29g/t Au Below Current Reserve |
Artemis Gold Inc economic studies
3 economic studies (PEA, pre-feasibility or feasibility) published by Artemis Gold Inc, read by Mining News Terminal. Base case after-tax figures; a study repeated in later releases is listed once.
| Study | Project | Date | After-tax NPV | IRR | Initial capex | Mine life | Release |
|---|---|---|---|---|---|---|---|
| Study | Blackwater Mine | 2024-02-21 | C$3.25B @5% | — | C$750M | 10 yrs | Artemis Gold Announces Results of Expansion Study for Blackwater Mine |
| FS | Blackwater | 2021-09-13 | C$2.15B @5% | 32.1% | C$645M | — | Artemis Announces Feasibility Study for Blackwater Project |
| PFS | Blackwater | 2020-08-26 | C$2.2B @5% | 34.8% | C$592M | — | Artemis Announces Revised PFS for Blackwater Project Unlevered After Tax NPV5 of $2.2 Billion After Tax IRR of 35% Payback on Initial Capital Costs of 2 Years |
Artemis Gold Inc production results
Production, guidance and milestones Artemis Gold Inc has reported, read by Mining News Terminal. A figure repeated in later releases is listed once.
Guidance
| Period | Metal | Guidance | Mine | Release |
|---|---|---|---|---|
| FY 2026 | Gold | 265,000–290,000 oz | — | 2026-10-13 |
Production
| Period | Metal | Produced | Sold | AISC | Mine | Release |
|---|---|---|---|---|---|---|
| Q3 2026 | Gold | 69,546 oz | — | — | — | 2026-10-13 |
| H1 2026 | Gold | 135,986 oz | 138,643 oz | — | — | 2026-08-06 |
| Q2 2026 | Gold | 74,063 oz | 78,126 oz | — | — | 2026-08-06 |
| Q1 2026 | Gold | 61,923 oz | — | — | — | 2026-05-06 |
| Q4 2025 | Gold | 68,480 oz | 67,852 oz | $925/oz | — | 2026-02-18 |
| FY 2025 | Gold | 192,808 oz | — | — | — | 2026-02-18 |
| Q3 2025 | Gold | 60,985 oz | 62,863 oz | $840/oz | — | 2025-11-04 |
| H1 2025 | Gold | 63,343 oz | — | — | — | 2025-08-12 |
| Q2 2025 | Gold | 50,623 oz | — | — | — | 2025-08-12 |
Milestones
- Resumption — Blackwater, 2026-03-18
- Commercial production — Blackwater, 2025-05-02
- First pour — Blackwater, 2025-01-29
Artemis Gold Inc exploration programs
Drilling, geophysics and ground programs Artemis Gold Inc has announced, read by Mining News Terminal. A program reported in several releases is listed once, from the latest.
| Date | Program | Project | Size | Method and metal |
|---|---|---|---|---|
| 2026-08-20 | Drilling, underway | Blackwater regional (2026) | 5,100 m, 33 holes | au |
| 2026-08-20 | Drilling, planned | Blackwater (2026) | 25,000 m | diamond - au, ag, zn |
| 2026-08-20 | Drilling, underway | Blackwater (2026) | 2 holes | diamond - au, ag, zn |
| 2026-08-06 | Drilling, planned | Top Lake (2026) | — | RC |
| 2026-08-06 | Drilling, planned | Blackwater (2026) | 25,000 m | diamond |
| 2026-08-06 | Drilling, underway | Blackwater (2026) | 25,000 m | diamond |