Log In

Don't have an account? Sign up

NexGold Mining Corp (NEXG) Mining Data

TSXV: NEXG · Gold, Copper · Development stage

NexGold Mining Corp mineral properties

No mineral properties are on file for this company yet.

NexGold Mining Corp drill result releases

22 drill result releases from NexGold Mining Corp, read by Mining News Terminal, newest first.

DateCompanyProjectHoleBest interceptIntervalsRelease
2026-11-03NexGold Mining Corp (NEXG)GoldboroRC-26-2714.16 g/t Au / 7m161NexGold Intersects 4.16 g/t Gold over 7.0 Metres, 2.84 g/t Gold over 7.0 Metres and 1.94 g/t Gold over 9.0 Metres in RC Infill Drill Program at the Goldboro Gold Project, Nova Scotia
2026-09-23NexGold Mining Corp (NEXG)Goliath GoldGL-26-03414.07 g/t Au / 7m58NexGold Intersects 14.07 g/t Gold over 7.0 Metres, 9.76 g/t Gold over 8.0 Metres and 2.84 g/t Gold over 13.0 Metres at the Goldlund Deposit, Ontario
2026-08-25NexGold Mining Corp (NEXG)Goliath GoldGL-26-02284.3 g/t Au / 1m66NexGold Intersects 3.08 g/t over 17.0 Metres, 4.80 g/t Gold over 5.6 Metres, 84.30 g/t over 1.0 Metres and Expands Drilling Program at the Goldlund Deposit, Ontario
2026-08-19NexGold Mining Corp (NEXG)GoldboroRC-26-2265.26 g/t Au / 7m83NexGold Intersects 5.26 g/t Gold over 7.0 Metres and 7.08 g/t Gold over 5.0 Metres in RC Infill Drill Program at the Goldboro Gold Project, Nova Scotia
2026-07-09NexGold Mining Corp (NEXG)GoldboroRC-26-14712.06 g/t Au / 6m126NexGold Intersects 12.06 g/t Gold over 6.0 Metres and 3.84 g/t Gold over 18.0 Metres During Infill Drill Program at Goldboro
2026-06-25NexGold Mining Corp (NEXG)GoldboroRC-26-07361.22 g/t Au / 12m190NexGold Intersects 61.22 g/t Gold over 12.0 Metres and 5.85 g/t Gold over 13.0 Metres During Infill Drill Program at the Goldboro Gold Project in Nova Scotia
2026-05-19NexGold Mining Corp (NEXG)Goliath GoldGL-26-00715.21 g/t Au / 20.1m66NexGold Reports Additional Broad, High-Grade Gold, Drill Intercepts at Goldlund, Supporting Mineral Resource Continuity and Expansion Potential Results Include 15.21 g/t Gold Over 20.1 Metres, 5.11 g/t Gold Over 21.8 Metres and 4.51 g/t Gold Over 21.9 Metres
2026-05-06NexGold Mining Corp (NEXG)Goliath GoldGL-26-003A14.1 g/t Au / 6m62NexGold Intersects 14.10 g/t Gold Over 6.0 Metres, 2.99 g/t Gold over 20.0 Metres and 10.67 g/t Gold Over 7.0 Metres at the Goldlund Deposit, Ontario
2026-04-10NexGold Mining Corp (NEXG)Goliath GoldGL-25-0151.79 g/t Au / 25.6m22NexGold Intersects 1.79 g/t Gold Over 25.6 Metres at the Goldlund Deposit, Ontario
2026-02-25NexGold Mining Corp (NEXG)Goliath GoldGL-25-0109.3 g/t Au / 11m27NexGold Intersects 9.30 g/t Gold Over 11.0 Metres and 2.31 g/t Gold Over 21.5 Metres at the Goldlund Deposit, Ontario
2026-02-02NexGold Mining Corp (NEXG)Goliath GoldGL-25-0033.31 g/t Au / 20m37NexGold Intersects 3.31 g/t Gold over 20.0 Metres at the Goldlund Deposit, and Announces Change in Board of Directors
2025-08-20NexGold Mining Corp (NEXG)Goldboro Open Pit GoldBR-25-59718.16 g/t Au / 2.1m84NexGold Intersects 18.16 g/t Gold over 2.1 Metres and 6.91 g/t Gold over 2.5 Metres at the Goldboro Open Pit Gold Project
2025-08-07NexGold Mining Corp (NEXG)Goldboro Open Pit GoldBR-25-58923.73 g/t Au / 5.3m104NexGold Intersects 23.73 g/t Gold over 5.3 Metres and 24.65 g/t Gold over 2.2 Metres at the Goldboro Open Pit Gold Project
2025-07-30NexGold Mining Corp (NEXG)Goldboro Open PitBR-25-57040.09 g/t Au / 17.7m80NexGold Intersects 40.09 g/t gold over 17.7 Metres at the Goldboro Open Pit Gold Project
2025-07-24NexGold Mining Corp (NEXG)Goldboro Open Pit GoldBR-25-578108.76 g/t Au / 1.4m97NexGold Continues to Intersect High-Grade Gold Mineralization at the Goldboro Open Pit Gold Project, Including 108.76 g/t Au over 1.40 metres and 67.23 g/t gold over 2.20 metres
2025-07-10NexGold Mining Corp (NEXG)Goldboro GoldBR-25-51677.3 g/t Au / 1.25m190NexGold Infill Drilling Continues to Intersect High-Grade Gold Mineralization at the Goldboro Gold Project, Including 77.30 g/t over 1.25 metres and 19.32 g/t gold over 3.50 metres
2025-07-09NexGold Mining Corp (NEXG)Goliath GoldTL2569813.67 g/t Au / 1.75m37NexGold Intersects 13.67 g/t over 1.75 metres and 1.05 g/t over 21.20 metres at the Goliath Deposit and Provides Update on Sprott Royalty
2025-06-19NexGold Mining Corp (NEXG)Goldboro GoldBR-25-5041.6 g/t Au / 36.8m81NexGold Infill Drilling Intersects 1.60 g/t Gold Over 36.80 Metres at the Goldboro Gold Project
2025-06-13NexGold Mining Corp (NEXG)GoldboroBR-25-52225.79 g/t Au / 4.5m77NexGold Infill Drilling Intersects 25.79 g/t Gold Over 4.5 Metres and 18.09 g/t Gold over 3.0 Metres at the Goldboro Gold Project
2025-06-05NexGold Mining Corp (NEXG)GoldboroBR-25-47511.87 g/t Au / 6.1m67NexGold Infill Drilling Intersects 11.87 g/t Gold Over 6.1 Metres and 3.77 g/t Gold Over 9.1 Metres at the Goldboro Gold Project
2025-04-10NexGold Mining Corp (NEXG)GoliathTL24-68910.25 g/t Au / 4.78m103NexGold Intersects High-Grade Gold Mineralization at Goliath West and Extends Gold Mineralization at the Far East Prospect
2024-12-05NexGold Mining Corp (NEXG)GoliathTL2467850.81 g/t Au / 6.3m28NexGold Intersects 6.3 metres of 50.81 g/t Au including 635 g/t Au over 0.5 Metres from Visible Gold Core Sample at the C Zone East

NexGold Mining Corp economic studies

5 economic studies (PEA, pre-feasibility or feasibility) published by NexGold Mining Corp, read by Mining News Terminal. Base case after-tax figures; a study repeated in later releases is listed once.

StudyProjectDateAfter-tax NPVIRRInitial capexMine lifeRelease
PFSGGC2024-05-02C$493M @5%33.5%—13 yrsTreasury Metals and Blackwolf to Create New Growth-Focused North American Gold Platform
PFSGoliath Gold Complex2024-03-22C$336M @5%25.4%——Treasury Metals Announces Filing of 2023 Annual Disclosure Documents and Provides a Corporate Update
PFSGoliath Gold Complex2023-02-22C$425M @5%30.1%C$335M2.8 yrsTreasury Metals Completes Pre-Feasibility Study for Goliath Gold Complex
PEAGoliath Gold Complex2021-03-11C$328M @5%30.2%C$233M13 yrsTreasury Metals Files PEA Technical Report for Goliath Gold Complex
PEAGoliath2017-03-08C$306M @5%25%C$133M13 yrsTreasury Metals Announces Significantly Improved Economics at Goliath Project After-Tax NPV of C$306 million and IRR of 25% at US $1,225 per ounce

NexGold Mining Corp royalties and streams

Royalty and stream deals NexGold Mining Corp has announced, read by Mining News Terminal. A deal reported in several releases is listed once.

DateInterestPropertyDealBuyerSellerPrice
2025-09-292.9% NSR—New / granted, closedAppian Capital AdvisoryNexGold MiningUS$24M
2025-09-250.6% NSR (gold)GoldboroBuyback / buy-down, agreedNexGold MiningNebariUS$24M
2025-09-252.9% NSR (gold)GoldboroNew / granted, agreedAppian Capital AdvisoryNexGold MiningUS$24M
2022-04-112.2% NSR (all minerals)—New / granted, closedSprott Resource Streaming and RoyaltyTreasury MetalsUS$20M
2022-02-142.2% NSRGoliathNew / granted, closedSprott Resource Streaming and RoyaltyTreasury MetalsUS$20M

NexGold Mining Corp exploration programs

Drilling, geophysics and ground programs NexGold Mining Corp has announced, read by Mining News Terminal. A program reported in several releases is listed once, from the latest.

DateProgramProjectSizeMethod and metal
2026-11-03Drilling, completedGoldboro30,000 m, 142 holesdiamond - gold
2026-11-03Drilling, completedGoldboro (2026)36,239 m, 154 holesRC - gold
2026-10-27Geophysics, completedGoldboro2496 line-kmVTEM - gold
2026-09-23Drilling, underwayGoliath Gold Complex (2026)3,603 m, 10 holesdiamond - gold
2026-08-25Drilling, completedGoldlund (2025)—diamond - gold
2026-08-25Drilling, completedGoldlund (2026)4,686 m, 11 holesdiamond - gold
2026-08-25Drilling, underwayGoldlund (2026)—diamond - gold
2026-08-25Drilling, completedGoliath Gold Complex (2026)25,000 mdiamond - gold
2026-08-13Geophysics, completedGoldboro (2026)2496 line-kmVTEM - gold
2026-08-13Drilling, underwayGoliath Complex (Goldlund Deposit) (2026)25,000 m, 23 holesdiamond - gold
2026-07-21Drilling, underwayGoldboro (2026)40,000 m, 600 holesRC - gold

NexGold Mining Corp NI 43-101 technical reports

NI 43-101 technical reports NexGold Mining Corp has commissioned, filed or withdrawn, read by Mining News Terminal. A report mentioned in several releases is listed once.

DateReportProjectDatesAuthors
2026-08-19Feasibility, commissionedGoldboro Gold Project—Nordmin Engineering

NexGold Mining Corp permits and approvals

Permits and government approvals NexGold Mining Corp has planned, applied for, received or had contested, read by Mining News Terminal. A permit reported in several releases is listed once, at its latest stage.

DatePermitProjectAuthority
2025-11-04Construction / operating, grantedGoldboro Gold ProjectFisheries and Oceans Canada (DFO)
2025-08-27Environmental assessment, grantedGoldboro Gold ProjectGovernment of Nova Scotia
2025-07-08Water, plannedGoldboro Gold ProjectFisheries and Oceans Canada
2025-05-22Land access / community, grantedGoldboro Gold ProjectGovernment of Nova Scotia

NexGold Mining Corp property options, earn-ins and staking

Mineral property options, earn-ins, staking, and claim and property purchases and sales NexGold Mining Corp has announced, read by Mining News Terminal. A deal reported in several releases is listed once, at its latest stage.

DateDealPropertyOther partyInterest
2025-09-25Option in / earn-in, proposed (loi)Goldboro——

Related lists

Browse MineTerminal Pro

Explore mining stocks: Gold stocks Copper stocks Silver stocks Lithium stocks Uranium stocks Nickel stocks Canada British Columbia Ontario United States Quebec Insider buying Top drill results All lists