Log In

Don't have an account? Sign up

Granada Gold Mine Inc (GGM) Financings

TSXV: GGM · Gold · Advanced Exploration stage

Granada Gold Mine Inc. continues to develop and explore its 100% owned Granada Gold Property near Rouyn-Noranda, Quebec, and is adjacent to the prolific Cadillac Break. The Company owns 14.73 square kilometres of land in a combination of mining leases and claims. The Company is currently advancing the Granada Gold Project through an updated mineral resource estimate and preliminary economic assessment, with drilling planned to target both lateral extensions and depth expansion of the existing mineral resource. The Granada Shear Zone and the South Shear Zone contain, based on historical detailed mapping as well as from current and historical drilling, up to twenty-two mineralized structures trending east-west over five and a half kilometres. Three of these structures were mined historically from four shafts and three open pits. Historical underground grades were 8 to 10 grams per tonne gold from two shafts down to 236 m and 498 m with open pit grades from 3.5 to 5 grams per tonne gold ( 43-101 reference ). The property includes the former Granada Gold underground mine which produced more than 50,000 ounces of gold at 10 grams per tonne gold in the 1930's from two shafts before a fire destroyed the surface buildings. In the 1990s, Granada Resources extracted a bulk sample (Pit #1) of 87,311 tonnes grading 5.17 g/t Au. They also extracted a bulk sample (Pit #2) of 22,095 tonnes grading 3.46 g/t Au. Details available on the Company's website: https://granadagoldmine.com/.

Granada Gold Mine Inc financial statements

Key figures read from 40 of 40 financial statement filings, Oct 27, 2016 to Feb 25, 2026. Each column is the period as the company first filed it.

Balance sheet: annual key figures

Canadian dollars (C$), figures as printed in the statements. Losses and cash outflows are in brackets.

Jun 2025Jun 2024Jun 2023Jun 2022Jun 2021
Cash and equivalentsC$11,013C$9,146C$15,407C$132,159C$193,104
Short-term investmentsC$37,367C$111,811C$120,920C$342,831C$1,637,378
Total current assetsC$96,126C$366,941C$376,868C$1,664,549C$3,231,735
Total current liabilitiesC$13,773,580C$12,711,086C$10,987,595C$9,417,286C$9,010,359
Working capital(C$13,677,454)(C$12,344,145)(C$10,610,727)(C$7,752,737)(C$5,778,624)
Property, plant and equipmentC$35,777C$100,495C$130,812C$179,340C$196,365
Total assetsC$516,324C$851,857C$892,101C$2,216,325C$3,800,536
DebtC$1,501,688C$1,386,725C$1,280,169C$1,182,329C$1,769,551
Total liabilitiesC$14,153,641C$13,067,172C$11,337,217C$9,811,787C$9,401,808
Shareholders' equity(C$13,637,317)(C$12,215,315)(C$10,445,116)(C$7,595,462)(C$5,601,272)

Income statement: annual key figures

Canadian dollars (C$), figures as printed in the statements. Losses and cash outflows are in brackets.

FY Jun 2025FY Jun 2024FY Jun 2023FY Jun 2022FY Jun 2021
Exploration and evaluation expenseC$156,988C$648,375C$1,379,247C$1,768,339C$4,237,051
General and administrativeC$30,999C$30,596C$73,328C$125,209C$119,600
Share-based compensationC$0C$82,781C$28,645—C$158,095
Net income (loss)C$753,069(C$1,929,730)(C$2,878,299)(C$4,081,063)(C$3,627,430)

Cash flow statement: annual key figures

Canadian dollars (C$), figures as printed in the statements. Losses and cash outflows are in brackets.

FY Jun 2025FY Jun 2024FY Jun 2023FY Jun 2022FY Jun 2021
Operating cash flow(C$264,619)(C$6,261)(C$122,752)(C$1,823,179)(C$5,301,839)
Investing cash flowC$66,486C$0C$6,000(C$36,181)C$92,458
Financing cash flowC$200,000——C$1,798,415C$5,134,571
Property, plant and equipment spending———(C$36,481)(C$184,144)
Proceeds from share issuesC$200,000——C$2,673,245C$3,899,128
Change in cashC$1,867(C$6,261)(C$116,752)(C$60,945)(C$74,810)
Cash at end of periodC$11,013C$9,146C$15,407C$132,159C$193,104

Granada Gold Mine Inc financings

1 financing announced or closed by Granada Gold Mine Inc, read by Mining News Terminal, newest first.

DateCompanyTypeStageAmountUnit priceRelease
2026-01-30Granada Gold Mine Inc (GGM)Private placement, non-brokeredClosed, 1 tranche$2.9M$0.050Granada Gold Mine Announces $2.5 million Private Placement

Granada Gold Mine Inc debt and credit facilities

Convertible debentures and notes, loans, credit facilities, bonds, gold loans and prepayments Granada Gold Mine Inc has announced, read by Mining News Terminal. A debt reported in several releases is listed once, at its latest stage.

DateDebtLenderAmountTerms
2017-12-22Convertible note / loan, amended—C$250,0008%
2017-11-15Loan, signed—C$250,0008%

Related lists

Browse MineTerminal Pro

Explore mining stocks: Gold stocks Copper stocks Silver stocks Lithium stocks Uranium stocks Nickel stocks Canada British Columbia United States Ontario Quebec Insider buying Top drill results All lists