Log In

Don't have an account? Sign up

Engineer Gold Mines Ltd. (EAU) Financings

TSXV: EAU · Gold, Silver · Exploration stage

The Engineer Gold Project encompasses approximately 18,319 hectares in northwestern British Columbia and is subdivided into three principal target areas: the Engineer Gold Mine, the TAG Property, and the Wann River prospect. The Project hosts a historical gold mineral resource at the past-producing underground Engineer Mine, as well as a historical gold-silver mineral resource on the TAG Property. In addition, the district contains numerous high-grade vein and shear-hosted gold targets with both bulk-tonnage and high-grade exploration potential, and a potential opportunity for small-scale production. Mineralization at the Engineer Mine and TAG Property is characteristic of epithermal-style systems, with additional epithermal targets identified across the Project, including the Happy Sullivan area. The Wann River prospect represents an orogenic gold target associated with the prolific Llewellyn Fault and has returned significant gold and silver values, including a grab sample of 263 g/t (7.67 oz/ton) gold and 1,350 g/t (39.37 oz/ton) silver from the Lum showing. Historical resources referenced herein are considered relevant but have not been verified by a Qualified Person and should not be relied upon.

Engineer Gold Mines Ltd. financial statements

Key figures read from 32 of 33 financial statement filings, Jul 25, 2018 to Jul 24, 2026. Each column is the period as the company first filed it.

Balance sheet: annual key figures

Canadian dollars (C$), figures as printed in the statements. Losses and cash outflows are in brackets.

Nov 2025Nov 2024Nov 2023Nov 2022Nov 2021
Cash and equivalentsC$2C$1,449C$1,514C$107,522C$554,346
Total current assetsC$20,031C$21,701C$20,585C$143,613C$593,986
Total current liabilitiesC$647,009C$512,930C$383,587C$295,621C$282,129
Working capital(C$626,978)(C$491,229)(C$363,002)(C$152,008)C$311,857
Exploration and evaluation assetsC$4,227,473C$4,197,126C$4,166,583C$4,153,691C$3,928,040
Property, plant and equipmentC$58,871C$75,456C$96,713C$124,185C$159,962
Total assetsC$4,499,320C$4,488,478C$4,493,700C$4,607,809C$4,781,988
DebtC$65,187C$62,582C$60,000C$49,758C$47,053
Total liabilities——C$383,587C$325,379C$309,182
Shareholders' equityC$3,787,124C$3,912,966C$4,110,113C$4,282,430C$4,472,806

Income statement: annual key figures

Canadian dollars (C$), figures as printed in the statements. Losses and cash outflows are in brackets.

FY Nov 2025FY Nov 2024FY Nov 2023FY Nov 2022FY Nov 2021
General and administrativeC$1,462C$923C$12,825C$141,187C$108,882
Share-based compensation——C$0C$10,000C$0
Net income (loss)(C$125,842)(C$197,147)(C$227,317)(C$341,276)(C$424,555)

Cash flow statement: annual key figures

Canadian dollars (C$), figures as printed in the statements. Losses and cash outflows are in brackets.

FY Nov 2025FY Nov 2024FY Nov 2023FY Nov 2022FY Nov 2021
Operating cash flow(C$76,182)(C$69,508)(C$126,285)(C$291,147)(C$285,175)
Investing cash flow(C$627)(C$13,082)C$22,778(C$325,651)(C$626,895)
Financing cash flowC$75,362C$82,525(C$2,501)C$169,974C$1,422,373
Exploration spending (capitalized)(C$627)(C$13,082)(C$22,778)(C$200,651)(C$466,894)
Proceeds from share issues—C$0C$55,000C$140,900C$1,587,526
Change in cash(C$1,447)(C$65)(C$106,008)(C$446,824)C$510,303
Cash at end of periodC$2C$1,449C$1,514C$107,522C$554,346

Engineer Gold Mines Ltd. financings

1 financing announced or closed by Engineer Gold Mines Ltd., read by Mining News Terminal, newest first.

DateCompanyTypeStageAmountUnit priceRelease
2026-05-08Engineer Gold Mines Ltd. (EAU)Private placement, non-brokeredClosed, 2 tranches$1.5M$0.150Engineer Gold Announces Private Placement

Related lists

Browse MineTerminal Pro

Explore mining stocks: Gold stocks Copper stocks Silver stocks Lithium stocks Uranium stocks Nickel stocks Canada British Columbia United States Ontario Quebec Insider buying Top drill results All lists