Cabral Gold Inc (CBR) Mining Data
TSXV: CBR · Gold · Development stage
- Market cap$403.9M
- Share price$1.16
- 52-week range$0.500 – $1.68
- Shares outstanding348,231,620
- ExchangeTSXV
- Websitecabralgold.com
- Company Overview
- Interactive Economic Study
- Mining Data
- News
- Financials
- Management Team
- Insider Sales
- SEDAR+ Filings
Cabral Gold Inc mineral properties
No mineral properties are on file for this company yet.
Cabral Gold Inc drill result releases
2 drill result releases from Cabral Gold Inc, read by Mining News Terminal, newest first.
| Date | Company | Project | Hole | Best intercept | Intervals | Release |
|---|---|---|---|---|---|---|
| 2026-08-27 | Cabral Gold Inc (CBR) | Cuiú Cuiú Gold | DDH411 | 5.8 g/t Au / 8.9m | 48 | Cabral Gold Drills 8.9m @ 5.8 g/t gold and Intersects New Mineralized Zone at Jerimum Cima Target, Cuiú Cuiú Gold District, Brazil |
| 2026-07-21 | Cabral Gold Inc (CBR) | MG | RC748 | 1.93 g/t Au / 17m | 54 | Cabral Gold Announces Additional Drill Results from Pre-Production Infill Drilling at the MG Gold Deposit, Cuiú Cuiú Gold District, Brazil |
Cabral Gold Inc economic studies
3 economic studies (PEA, pre-feasibility or feasibility) published by Cabral Gold Inc, read by Mining News Terminal. Base case after-tax figures; a study repeated in later releases is listed once.
| Study | Project | Date | After-tax NPV | IRR | Initial capex | Mine life | Release |
|---|---|---|---|---|---|---|---|
| PFS | Cuiú Cuiú | 2025-10-16 | US$74M @5% | 78% | US$37.7M | 6.2 yrs | Cabral Gold Secures US$45 Million Gold Loan to Fully Fund Heap Leach Starter Operation Board of Directors Approves Construction Decision |
| PFS | Cuiú Cuiú | 2025-09-25 | US$73.9M | 78% | US$37.7M | — | Cabral Gold Expands the Gold-in-Oxide Blanket at PDM by 50% and Discovers Two New Zones of Primary Gold Mineralization at the PDM Target, Cuiu Cuiu Gold District |
| PFS | Cuiú Cuiú Gold | 2024-10-21 | US$25.2M @5% | 47.3% | US$37.4M | 4.5 yrs | Cabral Gold Announces Positive Prefeasibility Study on the Gold-in-Oxide Starter Operation at the Cuiú Cuiú Gold Project, Brazil with After-Tax IRR of 47.3% |
Cabral Gold Inc production results
Production, guidance and milestones Cabral Gold Inc has reported, read by Mining News Terminal. A figure repeated in later releases is listed once.
Milestones
- First pour — Cuiú Cuiú, 2026-09-10
Cabral Gold Inc royalties and streams
Royalty and stream deals Cabral Gold Inc has announced, read by Mining News Terminal. A deal reported in several releases is listed once.
| Date | Interest | Property | Deal | Buyer | Seller | Price |
|---|---|---|---|---|---|---|
| 2023-07-28 | 1% NSR (gold) | Cuiú Cuiú | New / granted, agreed | Osisko Gold Royalties | Cabral Gold | US$5M |
Cabral Gold Inc exploration programs
Drilling, geophysics and ground programs Cabral Gold Inc has announced, read by Mining News Terminal. A program reported in several releases is listed once, from the latest.
| Date | Program | Project | Size | Method and metal |
|---|---|---|---|---|
| 2026-10-20 | Drilling, completed (previous owner) | Central | — | diamond - gold |
| 2026-10-20 | Drilling, underway | Machichie Main | — | RC - gold |
| 2026-10-20 | Drilling, underway | Jerimum Cima | — | RC - gold |
| 2026-10-20 | Drilling, underway | Mutum | — | diamond - gold |
| 2026-10-20 | Drilling, underway | Machichie | — | diamond - gold |
| 2026-10-20 | Drilling, underway | Jerimum Cima | 10 m, 25 holes | diamond - gold |
| 2026-10-20 | Drilling, planned | Central North | — | diamond - gold |
| 2026-10-20 | Drilling, completed | Central | 5 holes | diamond - gold |
Cabral Gold Inc NI 43-101 technical reports
NI 43-101 technical reports Cabral Gold Inc has commissioned, filed or withdrawn, read by Mining News Terminal. A report mentioned in several releases is listed once.
| Date | Report | Project | Dates | Authors |
|---|---|---|---|---|
| 2025-09-11 | Pre-feasibility, filed | Cuiú Cuiú Gold Project | filed 2025-09-11 | Ausenco do Brasil Engenharia |
Cabral Gold Inc permits and approvals
Permits and government approvals Cabral Gold Inc has planned, applied for, received or had contested, read by Mining News Terminal. A permit reported in several releases is listed once, at its latest stage.
| Date | Permit | Project | Authority |
|---|---|---|---|
| 2026-08-13 | Mining licence / lease, planned | Cuiú Cuiú | SEMAS/PA |
| 2026-08-13 | Other, granted | Cuiú Cuiú | Brazilian military authorities |
| 2026-08-13 | Construction / operating, granted | Cuiú Cuiú | SEMAS/PA |
| 2026-03-10 | Environmental assessment, granted | Cuiú Cuiú | Environmental Council (COEMA) for the state of Pará |
| 2022-06-30 | Construction / operating, granted | Cuiú Cuiú | — |
| 2022-06-30 | Construction / operating, granted | Cuiú Cuiú | Para State Environmental Agency (SEMAS/PA) |