Log In

Don't have an account? Sign up

Gran Pilar Gold-Silver Project

Project of Tocvan Ventures Corp. (TOC)

Gran Pilar Gold-Silver Project as reported in Tocvan Ventures Corp.’s news releases, read by Mining News Terminal. Each row links to its release.

Drill results

DateHoleBest interceptHoles in release
2026-09-23JES-26-1750.5 g/t Au / 106.75m22
2026-09-10JES-26-1620.1 g/t Au / 247.05m86
2026-08-06JES-26-1550.56 g/t Au / 215m47
2026-07-23JES-26-15241.15 g/t Ag / 35.1m65
2026-04-01JES-26-1350.55 g/t Au / 22.88m158
2026-01-23JES-25-12423.4 g/t Ag / 7.64m237
2025-05-07JES-25-1141.02 g/t Au / 41.18m60
2025-04-16JES-24-1120.48 g/t Au / 46.85m133
2025-03-26JES-25-10821.58 g/t Au / 3m86
2025-03-19JES-25-1050.95 g/t Au / 66m95
2025-03-11JES-25-1041.27 g/t Au / 83.45m56
2025-02-25JES-24-1010.61 g/t Au / 106.8m60
2025-02-25JES-25-12041 g/t Ag / 42.7m114

Exploration programs

DateProgramSizeMethod and metal
2026-10-29ground, completed—gold, silver
2026-09-23drilling, underway—gold, silver
2026-08-28ground, completed—gold, silver
2026-08-06drilling, underway—gold, silver
2026-05-28drilling, underway19 holesgold, silver
2026-05-28drilling, completed—RC · gold, silver
2026-05-28drilling, completed—RC · gold, silver
2026-05-28drilling, completed—RC · gold, silver
2026-05-28drilling, completed—RC · gold, silver
2026-05-28drilling, completed—RC · gold, silver
2026-05-13ground, completed—gold, silver
2026-05-13drilling, completed—RC · gold, silver
2026-05-13drilling, completed—RC · gold, silver
2026-05-13drilling, completed—RC · gold, silver
2026-05-13drilling, completed—RC · gold, silver
2026-05-13drilling, completed—RC · gold, silver
2026-05-11drilling, planned—gold, silver
2026-05-11drilling, completed—RC · gold, silver
2026-05-11drilling, completed—RC · gold, silver
2026-05-11drilling, completed—RC · gold, silver
2026-05-11drilling, completed—RC · gold, silver
2026-05-11drilling, completed—RC · gold, silver
2026-04-15ground, started—gold, silver
2026-04-15drilling, underway—gold, silver
2026-04-15drilling, completed—RC · gold, silver

162 entries in all; the latest 25 are shown.

Mine development

DateEventStatus
2026-05-28construction progressunderway

Permits

DatePermitStatusAuthority
2026-05-11Community agreementgranted—
2025-07-30Permit for Drillgranted—

Land deals

DateDealStatusInterestArea
2026-08-27claim purchasecompleted49%105 ha
2026-07-09claim purchasesigned49%105 ha

Sampling

DateSampleBest result
2026-10-29trench, rock24.4 g/t Au
2026-08-28grab, rock2.4 g/t Au
2024-11-12soil, geochem100 ppb Au
2024-11-12grab, rock12 g/t Ag

News timeline

DateHeadline
2026-10-29Tocvan: Gran Pilar Trench Samples to 24.4 g/t Au`
2026-09-23TOCVAN EXPANDS EL MEZQUITE; DRILLING RETURNS 106.8 M OF 0.5 G/T AU
2026-09-10TOCVAN CONFIRMS GOLD MINERALIZATION ALONG ENTIRE 1,300- METRE EL MEZQUITE TREND AT GRAN PILAR
2026-08-28TOCVAN ANNOUNCES NEW SURFACE MINERALIZATION IN SEVERAL ZONES AT GRAN PILAR GOLD-SILVER PROJECT
2026-08-27TOCVAN COMPLETES ACQUISITION OF REMAINING 49% INTEREST IN ORIGINAL PILAR CONCESSIONS, CONSOLIDATING 100% OWNERSHIP OF FLAGSHIP GRAN PILAR GOLD-SILVER PROJECT
2026-08-06TOCVAN DRILLS SIGNIFICANT DISCOVERY ON MEZQUITE TREND GRAN PILAR 215M OF 0.6 G/T AU, FROM 36.6M DOWNHOLE
2026-07-23TOCVAN DISCOVERS NEW HIGH-GRADE AT-SURFACE SILVER-GOLD ZONE 900 M EAST OF PILOT FACILITY AT GRAN PILAR PROJECT
2026-07-09TOCVAN ENTERS INTO DEFINITIVE AGREEMENT TO ACQUIRE REMAINING 49% INTEREST IN ORIGINAL PILAR CONCESSIONS, CONSOLIDATING 100% OWNERSHIP OF FLAGSHIP GRAN PILAR GOLD-SILVER PROJECT
2026-05-28TOCVAN INTERSECTS THREE NEW GOLD-SILVER ZONES AT GRAN PILAR PROJECT EXPLORATION DRILLING; PROVIDES PILOT MINE DEVELOPMENT UPDATE Expands Surface Exploration Program
2026-05-13TOCVAN ANNOUNCES NEW SURFACE GOLD-SILVER RESULTS, OUTLINING NEW TARGET 3 KILOMETERS EAST OF MAIN ZONE AT GRAN PILAR GOLD-SILVER PROJECT
2026-05-11TOCVAN ACCELERATES GRAN PILAR: 5,000+ METERS DRILLED TO DATE, HISTORIC WORKINGS DISCOVERED ON SOUTH BLOCK, PILOT PROGRESSES
2026-04-15TOCVAN MOBILIZES HEAVY EQUIPMENT AT GRAN PILAR TO ACCELERATE TRENCHING AND MINE WORKS
2026-04-08TOCVAN ANNOUNCES ADDITION OF SECOND DRILL RIG AND ACCELERATES HIGH-PRIORITY DRILL TARGETS AT FLAGSHIP GRAN PILAR GOLD-SILVER PROJECT
2026-04-01TOCVAN DISCOVERS NEW GOLD-SILVER ZONE 1,600 METERS FROM MAIN ZONE AT SOUTH BLOCK GRAN PILAR; FIRST AGGRESSIVE STEP-OUT DRILLING INTERSECTS MINERALIZATION FROM SURFACE
2026-01-23TOCVAN ANNOUNCES MULTIPLE SILVER ZONES IN DEBUT DRILL RESULTS FROM THE GRAN PILAR PROJECT NORTH BLOCK
2025-12-22TOCVAN BEGINS TRENCHING MATERIAL FOR THE PILOT MINE AND PUSHES AHEAD WITH INFRASTRUCTURE DEVELOPMENT
2025-11-11TOCVAN ANNOUNCES MAIDEN DRILL PROGRAM UNDERWAY AT NORTH BLOCK GRAN PILAR GOLD-SILVER PROJECT
2025-10-23TOCVAN ANNOUNCES DISCOVERY OF TWO NEW TARGET AREAS WITH HISTORIC UNDERGROUND WORKINGS AT NORTH BLOCK GRAN PILAR GOLD-SILVER PROJECT
2025-10-20TOCVAN ADVANCES DRILLING, TRENCHING, AND PILOT MINE PREPARATION, MOBILIZING EQUIPMENT TO NORTH AND SOUTH BLOCKS AT GRAN PILAR GOLD-SILVER PROJECT
2025-10-09TOCVAN ANNOUNCES DISCOVERY OF NEW TARGET WITH HISTORIC UNDERGROUND WORKINGS IN NORTH ALTERATION ZONE AT GRAN PILAR GOLD-SILVER PROJECT
2025-10-07TOCVAN ANNOUNCES INITIAL FINDINGS FROM DRONE MAGNETIC SURVEY AT GRAN PILAR GOLD-SILVER PROJECT: DISCOVERY OF STRUCTURAL COMPLEX IN SOUTH BLOCK ALIGNS WITH PERMITTED DRILL TARGETS
2025-09-16TOCVAN ANNOUNCES COMMENCEMENT OF FIELD WORK AND AIRBORNE MAGNETICS SURVEY AT GRAN PILAR GOLD SILVER PROJECT DRILLING AND TRENCHING PREP ACCELERATE DISCOVERY & PILOT MINE PRODUCTION
2025-08-14TOCVAN SECURES FULL PERMIT APPROVAL FOR PILOT MINE FACILITY AT GRAN PILAR GOLD-SILVER PROJECT
2025-07-30TOCVAN SECURES PERMIT APPROVAL FOR ALL DRILLING AND EXTRACTION AT GRAN PILAR GOLD-SILVER PROJECT, ADVANCING PILOT MINE DEVELOPMENT
2025-06-18TOCVAN ADVANCES WITH PILOT DESIGN AT ITS 100% CONTROLLED GRAN PILAR GOLD-SILVER PROJECT
2025-05-07Tocvan Discovers Another Near Surface High-Grade Corridor at Gran Pilar Gold – Silver Project Drills 6.1 meters of 5.4 g/t Gold and 39 g/t Silver within 41.2 meters of 1.0 g/t Gold and 10 g/t Silver
2025-04-24Tocvan Drilling Update Gran Pilar Gold – Silver Project Provides Corporate Update and Webinar Announcement
2025-04-16Tocvan Core Drilling Extends Main Zone, 70 meters South Returns 7.2 g/t Gold and 80 g/t Silver Over 2.6 meters within 46.9 meters of 0.5 g/t Gold
2025-04-10Tocvan Commences Drilling at Gran Pilar Gold – Silver Project Continues Expansion Zone Drilling Along Northern Corridors
2025-03-26Tocvan Core Drilling Discovers Highest Gold-Grade Interval Ever Outside of the Main Zone, 300 meters East Returns 21.6 g/t Gold and 209 g/t Ag Over 3.0 meters within 64.9 meters of 1.2 g/t Gold
2025-03-19Tocvan Core Drilling Returns 1.0 g/t Gold Over 66 meters from Surface Includes High-Grade 15.2 g/t Gold Over 1.2 meters and 5.8 g/t Gold Over 3 meters
2025-03-11Tocvan Core Drilling Returns 10.3 g/t Gold Over 9.7 meters within 83.5 meters of 1.3 g/t Gold Includes 60.6 g/t Gold Over 1.6 meters, Highest-Grade Interval Since Prospect Discovery
2025-02-25Tocvan Discovers New High-Grade Gold in First Drilling on 100% Controlled Expansion Area RC Drilling Returns 19.4 g/t Au over 3.1 meters within 106.8 meters of 0.6 g/t Au from Surface
2025-02-25TOCVAN DRILLS BROADEST SILVER ZONE EVER AT 100% CONTROLLED GRAN PILAR DRILLS 42.7 METERS OF 41 G/T SILVER FROM SURFACE, INCLUDING 10.7 METERS OF 136 G/T (4.4 OZ) SILVER
2025-02-12Tocvan Provides Update for Gran Pilar Gold Silver Project; Ten Core Drillholes Completed, Totaling 1,122 meters
2025-01-22Tocvan Surface Exploration Expands Targets at Gran Pilar Gold Silver Project
2025-01-08Tocvan Announces Core Drilling Underway at Gran Pilar Gold Silver Project
2024-12-11Tocvan Closes First Tranche of Private Placement for $2.1 Million RC Drilling Underway at Gran Pilar Gold - Silver Project – Expansion Area
2024-11-27Tocvan Announces $3.0 Million Non-Brokered Private Placement Secures $1.8 Million from Institutional Investor Set to Mobilize Drill Rigs for Gran Pilar Gold Silver Project
2024-11-12Tocvan Outlines High Grade Expansion Targets Through Soil Sampling at Gran Pilar Soils Return up to 21.2 g/t Gold and >2,000 g/t Silver
2024-09-10Tocvan Establishes Broad Footprint of Gold - Silver Potential Across Gran Pilar Open for Expansion Prepares for Next Phase of Drilling and Development
2024-08-13Tocvan Provides Update Surface Sampling Ongoing, Preparing for Next Phases of Drilling, Plans for On-site Pilot Plant

Other projects of Tocvan Ventures Corp.

Tocvan Ventures Corp. properties

Related lists

Browse MineTerminal Pro

Explore mining stocks: Gold stocks Copper stocks Silver stocks Lithium stocks Uranium stocks Nickel stocks Canada British Columbia Ontario United States Quebec Insider buying Top drill results All lists