Log In

Don't have an account? Sign up

Fitzroy Minerals Inc. (FTZ) Mining Data

TSXV: FTZ · Copper, Gold, Silver · Exploration stage

Fitzroy Minerals Inc. mineral properties

No mineral properties are on file for this company yet.

Fitzroy Minerals Inc. drill result releases

8 drill result releases from Fitzroy Minerals Inc., read by Mining News Terminal, newest first.

DateCompanyProjectHoleBest interceptIntervalsRelease
2026-08-20Fitzroy Minerals Inc. (FTZ)Buen Retiro CopperBRT-DDH0940.74% Cu / 105m34Fitzroy Minerals Intersects Highest Grade Copper to Date and Extends the Strike Length of the Main Mineralized Trend to 1.9 km at the Buen Retiro Copper Project, Chile
2026-07-23Fitzroy Minerals Inc. (FTZ)Buen RetiroBRT-DDH0720.97% Cu / 111.9m44Fitzroy Minerals Intersects 111.9 m at 0.97% Cu from 21.1 m, Including 18.0 m at 1.59% Cu from 84.0 m at the Buen Retiro Copper Project, Chile
2026-06-29Fitzroy Minerals Inc. (FTZ)Buen Retiro CopperBRT-DDH0521.73% Cu / 59m26Fitzroy Minerals Intersects 59.0 m at 1.73% Cu from 92.0 m, Including 12.0 m at 5.39% Cu from 136.0 m, and Expands the Drill Program to 22,000 m, at the Buen Retiro Copper Project, Chile
2026-05-13Fitzroy Minerals Inc. (FTZ)Buen Retiro CopperBRT-DDH0591.7% Cu / 78m13Fitzroy Minerals Intersects 78.0 m at 1.70% Cu from 58.0 m, including 40.0 m at 3.02% Cu from 92.0 m at the Buen Retiro Copper Project, Chile
2026-04-16Fitzroy Minerals Inc. (FTZ)Buen Retiro CopperBRT-DDH0480.53% Cu / 92.5m4Fitzroy Minerals Continues with 2-Rig Definition Drilling, Intercepting 92.5 m at 0.53% Cu from 3.5 m, as it Moves Toward a Maiden Mineral Resource Estimate and Initial Economic Study at the Buen Retiro Copper Project, Chile
2026-02-09Fitzroy Minerals Inc. (FTZ)Buen RetiroBRT-DDH0410.41% Cu / 108m29Fitzroy Minerals Reports on Latest Drilling Results and Extends Oxide Zone to 1.7 km, Buen Retiro Copper Project, Chile
2025-06-06Fitzroy Minerals Inc. (FTZ)Buen RetiroBRT-DDH0221.94% Cu / 110m14Buen Retiro Copper Project, Chile
2025-03-27Fitzroy Minerals Inc. (FTZ)CaballosCAB-DDH0010.83% CuEq / 200m2Fitzroy Minerals Reports 200 m at 0.83% CuEq, Including 42 m at 2.31% CuEq in New Copper-Molybdenum-Gold-Rhenium, Mineralizing System Identified at the Caballos Copper Project, Chile

Fitzroy Minerals Inc. NI 43-101 technical reports

NI 43-101 technical reports Fitzroy Minerals Inc. has commissioned, filed or withdrawn, read by Mining News Terminal. A report mentioned in several releases is listed once.

DateReportProjectDatesAuthors
2026-04-16Pre-feasibility, commissionedBuen Retiro Copper Project——
2026-04-16Resource estimate, commissionedBuen Retiro Copper Project——
2024-11-08Property report, filedBuen Retiro Copper Projecteffective 2024-08-15, filed 2024-11-08—
2024-09-04Property report, filedCaballos Copper Projecteffective 2024-06-21, filed 2024-09-04Caracle Creek

Fitzroy Minerals Inc. property options, earn-ins and staking

Mineral property options, earn-ins, staking, and claim and property purchases and sales Fitzroy Minerals Inc. has announced, read by Mining News Terminal. A deal reported in several releases is listed once, at its latest stage.

DateDealPropertyOther partyInterest
2024-11-20Option in / earn-in, signedCaballosMarrad—
2024-05-22Option in / earn-in, signedPolimet Gold-Copper-Silver—100%
2023-11-30Option in / earn-in, signedCaballosAsesorias Doce S.A100%

Related lists

Browse MineTerminal Pro

Explore mining stocks: Gold stocks Copper stocks Silver stocks Lithium stocks Uranium stocks Nickel stocks Canada British Columbia United States Ontario Quebec Insider buying Top drill results All lists