Log In

Don't have an account? Sign up

DPM Metals Inc. (DPM) Mining Data

TSX: DPM · Gold · Production stage

DPM Metals Inc. mineral properties

No mineral properties are on file for this company yet.

DPM Metals Inc. drill result releases

7 drill result releases from DPM Metals Inc., read by Mining News Terminal, newest first.

DateCompanyProjectHoleBest interceptIntervalsRelease
2026-09-20DPM Metals Inc. (DPM)Chelopech—3.28 g/t AuEq / 328m5DPM Metals Expands Brevene Porphyry South Discovery with New High-Grade Intercepts
2026-09-08DPM Metals Inc. (DPM)RakitaBIDD2532.66% CuEq / 76m9DPM Metals Extends Mineralization at Dumitru Potok with High-Grade Intercepts
2026-06-03DPM Metals Inc. (DPM)Chelopech—2.52 g/t AuEq / 713m4DPM Metals Announces Discovery of High-Grade Porphyry Mineralization Adjacent to Chelopech Mine; Results include 713 Metres at 2.52 g/t AuEq (comprising of 1.31 g/t Au and 1.16% Cu)
2026-05-20DPM Metals Inc. (DPM)ChelopechEX_WZD_165_0315.28 g/t AuEq / 58m3DPM Metals Reports New High-Grade Intercepts from the Chelopech Wedge Zone Deep Prospect; Expects Mineral Resource Estimate by Year-End 2026
2025-11-19DPM Metals Inc. (DPM)Chelopech—7.42 g/t AuEq / 68.3m9DPM Metals Announces Discovery of New High-Grade Mineralization at the Chelopech Mine; Results Include 68.3 metres at 7.42 g/t AuEq
2025-09-10DPM Metals Inc. (DPM)RakitaDPDD0323.93% CuEq / 131.6m31Dundee Precious Metals Announces High-Grade Intercepts at Dumitru Potok | 1 Du n d ee Precio u s Me t als Rep o rt s Hig h -Grad e In t ercep t s at Du m it ru Po t o k of 131.6 m et res g ra d in g 3.93 % C u Eq an d 76 m et res at 2.4 7 % Cu Eq
2025-02-19DPM Metals Inc. (DPM)Rakita—2.07% Cu / 190m35Dundee Precious Metals Reports Wide High-Grade Intercepts from the Dumitru Potok Prospect; Results include 190 metres at 2.07% Cu, 1.23 g/t Au and 12.19 g/t Ag.

DPM Metals Inc. production results

Production, guidance and milestones DPM Metals Inc. has reported, read by Mining News Terminal. A figure repeated in later releases is listed once.

Guidance

PeriodMetalGuidanceMineRelease
FY 2026Gold equiv.105,000–130,000 oz—2026-08-17
FY 2026Silver3,500,000–4,100,000 oz—2026-02-10
FY 2026Gold30,000–35,000 oz—2026-02-10

Production

PeriodMetalProducedSoldAISCMineRelease
Q2 2026Gold equiv.186,732 oz———2026-07-30
H1 2026Silver113,000 oz———2026-07-08
Q2 2026Silver62,000 oz———2026-07-08
Q1 2026GEO84,042 oz65,985 oz——2026-05-05
Q1 2026Gold equiv.84,042 oz———2026-05-05
Q4 2025Gold45,700 oz———2026-01-12
Q4 2025Copper9,900,000 lb———2026-01-12
Q2 2025Gold47,000 oz———2025-07-08
Q2 2025Copper6,400,000 lb———2025-07-08
Q1 2025Gold49,863 oz—$1,244/oz—2025-05-06
Q1 2025Copper5,900,000 lb———2025-04-07
Q4 2024Gold41,900 oz———2025-01-08

Milestones

DPM Metals Inc. NI 43-101 technical reports

NI 43-101 technical reports DPM Metals Inc. has commissioned, filed or withdrawn, read by Mining News Terminal. A report mentioned in several releases is listed once.

DateReportProjectDatesAuthors
2026-03-05Property report, filedChelopech Minefiled 2026-03-05—
2026-01-16Resource estimate, filedRakita Camp Prospectsfiled 2026-01-16—
2026-01-12Property report, filedRakita Gold Projectfiled 2026-01-12—
2025-10-16Property report, filedVareš Mineeffective 2025-04-01, filed 2025-10-16—
2025-06-13Technical report, commissionedVareš Mine——
2024-12-18Pre-feasibility, commissionedRakita Projecteffective 2023-11-16—
2024-12-18Feasibility, commissionedRakita Project——
2024-11-05Pre-feasibility, commissionedLoma Larga Projectexpected During the third quarter of 2024—
2024-09-13PEA, commissionedRakita Project——
2024-01-24Resource estimate, filedRakita Gold Projectfiled 2024-01-24—
2023-08-01Feasibility, commissionedLoma Larga Projectexpected in the second half of 2023—
2023-02-23Resource estimate, filedAda Tepe Gold Minefiled 2023-02-23—

DPM Metals Inc. permits and approvals

Permits and government approvals DPM Metals Inc. has planned, applied for, received or had contested, read by Mining News Terminal. A permit reported in several releases is listed once, at its latest stage.

DatePermitProjectAuthority
2019-08-30Construction / operating, grantedAda Tepe Mine—

Related lists

Browse MineTerminal Pro

Explore mining stocks: Gold stocks Copper stocks Silver stocks Lithium stocks Uranium stocks Nickel stocks Canada British Columbia United States Ontario Quebec Insider buying Top drill results All lists