Log In

Don't have an account? Sign up

Ur-Energy Inc. (URE) Mining Data

TSX: URE · Uranium · Production stage

Ur-Energy Inc. mineral properties

No mineral properties are on file for this company yet.

Ur-Energy Inc. economic studies

3 economic studies (PEA, pre-feasibility or feasibility) published by Ur-Energy Inc.. Base case after-tax figures; a study repeated in later releases is listed once.

StudyProjectDateAfter-tax NPVIRRInitial capexMine lifeRelease
StudyLost Creek Property2026-03-10US$166M @8%—US$46.5M—Ur-Energy Updates Lost Creek Property Technical Report Summary Estimating an Extended Mine Life and Increase in Net Cash Flow
StudyLost Creek ISR Uranium Property2024-03-06US$83.2M69%US$18.2M—Ur-Energy Files Updated S-K 1300 Reports for the Lost Creek ISR Uranium Property and the Shirley Basin ISR Uranium Project
StudyLost Creek ISR Uranium Property2022-03-09C$211M66.8%C$23.7M13 yrsUr-Energy Files S-K 1300 Initial Assessments for the Lost Creek ISR Uranium Property and the Shirley Basin ISR Uranium Project

Ur-Energy Inc. production results

Production, guidance and milestones Ur-Energy Inc. has reported. A figure repeated in later releases is listed once.

Production

PeriodMetalProducedSoldAISCMineRelease
Q3 2026U3o8104,586 lb———2026-11-09
Q2 2026U3o8140,873 lb———2026-08-10
Q1 2026U3O895,599 lb55,000 lb——2026-05-08

Milestones

Ur-Energy Inc. exploration programs

Drilling, geophysics and ground programs Ur-Energy Inc. has announced. A program reported in several releases is listed once, from the latest.

DateProgramProjectSizeMethod and metal
2026-11-17Drilling, completed (previous owner previous owner (unnamed))Lost Soldier4,000 holesuranium
2026-11-17Ground work, startedLost Soldier (2026)—mixed - uranium
2026-11-09Drilling, completedNorth Hadsell (2026)10,302 m, 33 holesuranium
2026-11-09Drilling, startedLost Creek South (2026)120 holesuranium
2026-10-29Drilling, plannedLost Creek South120 holesuranium, rare earths
2026-08-10Drilling, completed (previous owner previous owner (unnamed))Lost Soldier (pre-2026)——
2026-08-10Drilling, underwayLost Creek (2026)—uranium

Ur-Energy Inc. NI 43-101 technical reports

NI 43-101 technical reports Ur-Energy Inc. has commissioned, filed or withdrawn. A report mentioned in several releases is listed once.

DateReportProjectDatesAuthors
2026-11-17Technical report, commissionedLost Soldier Uranium Project——

Ur-Energy Inc. permits and approvals

Permits and government approvals Ur-Energy Inc. has planned, applied for, received or had contested. A permit reported in several releases is listed once, at its latest stage.

DatePermitProjectAuthority
2025-04-28Other, plannedLC East ProjectU.S. Environmental Protection Agency
2025-04-28Mining licence / lease, renewed / amendedLC East ProjectWyoming Uranium Recovery Program
2025-04-28Plan of operations / notice, renewed / amendedLC East ProjectBureau of Land Management
2025-04-28Mining licence / lease, renewed / amendedLC East ProjectWyoming Department of Environmental Quality, Land Quality Division (LQD)

Related lists

Browse MineTerminal Pro

Explore mining stocks: Gold stocks Copper stocks Silver stocks Lithium stocks Uranium stocks Nickel stocks Canada United States British Columbia Ontario Quebec Insider buying Top drill results All lists