Talon Metals Corp (TLO) Mining Data
TSX: TLO · Nickel, Copper, Cobalt · Production stage
- Market cap$1.32B
- Share price$8.16
- 52-week range$3.65 – $11.23
- Shares outstanding162,249,483
- ExchangeTSX
- Websitetalonmetals.com
- Company Overview
- Interactive Economic Study
- Mining Data
- News
- Financials
- Management Team
- Insider Sales
- SEDAR+ Filings
Talon Metals Corp mineral properties
No mineral properties are on file for this company yet.
Talon Metals Corp drill result releases
18 drill result releases from Talon Metals Corp, read by Mining News Terminal, newest first.
Talon Metals Corp economic studies
4 economic studies (PEA, pre-feasibility or feasibility) published by Talon Metals Corp, read by Mining News Terminal. Base case after-tax figures; a study repeated in later releases is listed once.
| Study | Project | Date | After-tax NPV | IRR | Initial capex | Mine life | Release |
|---|---|---|---|---|---|---|---|
| Study | Eagle Mine | 2026-04-30 | US$19M @8% | — | — | — | Talon Metals Announces Eagle Mine NI 43-101 Technical Report Results; Provides Highlights and Strategic Takeaways |
| PEA | Tamarack Nickel | 2021-02-04 | US$569M @7% | 31.9% | — | — | Talon Metals Announces Updated PEA on the Tamarack Nickel Project: After-Tax NPV Increases 96% to US$569 Million PEA Demonstrates Robust Economics and Optionality to Produce Nickel for the Electric Vehicle or Stainless Steel |
| PEA | Tamarack North | 2020-03-05 | US$291M @7% | 36% | US$259M | 6.4 yrs | Talon Metals Announces Improved Economics Under Its Updated PEA and a 106% Increase in Overall Tonnage Included in the Mine Plan, Along with an Increased Mine Life |
| PEA | Tamarack High Grade Nickel-Copper-Cobalt | 2018-11-12 | US$210M @7% | 39% | US$183M | 7 yrs | Talon Metals Announces Results of Initial PEA and Follow-Up Exploration Plans at the Tamarack High Grade Nickel-Copper-Cobalt Project |
Talon Metals Corp royalties and streams
Royalty and stream deals Talon Metals Corp has announced, read by Mining News Terminal. A deal reported in several releases is listed once.
| Date | Interest | Property | Deal | Buyer | Seller | Price |
|---|---|---|---|---|---|---|
| 2024-07-05 | NSR | — | New / granted, agreed | — | Talon Metals | US$8M |
Talon Metals Corp exploration programs
Drilling, geophysics and ground programs Talon Metals Corp has announced, read by Mining News Terminal. A program reported in several releases is listed once, from the latest.
| Date | Program | Project | Size | Method and metal |
|---|---|---|---|---|
| 2026-10-06 | Geophysics, completed | Roland | — | other - nickel, copper |
| 2026-10-06 | Drilling, completed | Roland (2025) | 1,500 m, 3 holes | nickel, copper |
| 2026-10-06 | Drilling, completed | Roland (2026) | 3 holes | nickel, copper |
| 2026-09-09 | Drilling, completed (previous owner) | Tamarack (2025) | 1,167 m, 1 holes | diamond - Ni, Cu, Co, Pd, Pt, Au |
| 2026-09-09 | Geophysics, completed | Tamarack | — | EM - Ni, Cu |
| 2026-09-09 | Drilling, completed | Tamarack (2025) | 3 holes | diamond - Ni, Cu, Co, Pd, Pt, Au |
| 2026-08-06 | Drilling, completed | Tamarack (2026) | 1 holes | diamond - nickel, copper, cobalt |
| 2026-08-04 | Geophysics, completed | Tamarack | — | EM - nickel, copper |
| 2026-08-04 | Drilling, underway | Tamarack | — | nickel, copper, cobalt |
| 2026-08-04 | Drilling, completed | Tamarack | 3 holes | nickel, copper, cobalt |
| 2026-08-04 | Drilling, underway | Tamarack | 937 m, 6 holes | diamond - nickel, copper, cobalt, platinum, palladium, gold |
| 2026-07-09 | Drilling, underway | Boulderdash | — | nickel, copper |
Talon Metals Corp NI 43-101 technical reports
NI 43-101 technical reports Talon Metals Corp has commissioned, filed or withdrawn, read by Mining News Terminal. A report mentioned in several releases is listed once.
| Date | Report | Project | Dates | Authors |
|---|---|---|---|---|
| 2026-09-10 | Feasibility, commissioned | Tamarack Project | expected in Q4 2026 | — |
| 2026-04-30 | Property report, filed | Eagle Mine | effective 2026-02-28, filed 2026-04-30 | WSP Canada |
Talon Metals Corp permits and approvals
Permits and government approvals Talon Metals Corp has planned, applied for, received or had contested, read by Mining News Terminal. A permit reported in several releases is listed once, at its latest stage.
| Date | Permit | Project | Authority |
|---|---|---|---|
| 2026-09-15 | Environmental assessment, in review | Tamarack Mining Project | Minnesota Department of Natural Resources (MN DNR) |
| 2024-02-23 | Government / policy, in review | Tamarack Nickel Project | Minnesota regulators and tribal sovereign governments |
| 2024-01-31 | Drill / exploration, granted | — | Michigan Department of Natural Resources |
Talon Metals Corp property options, earn-ins and staking
Mineral property options, earn-ins, staking, and claim and property purchases and sales Talon Metals Corp has announced, read by Mining News Terminal. A deal reported in several releases is listed once, at its latest stage.
| Date | Deal | Property | Other party | Interest |
|---|---|---|---|---|
| 2025-03-05 | Option out, signed | Tamarack | Lundin Mining | 70% |