Log In

Don't have an account? Sign up

Rio2 Limited (RIO) Mining Data

TSX: RIO · Copper, Gold, Silver · Production stage

Rio2 Limited mineral properties

No mineral properties are on file for this company yet.

Rio2 Limited economic studies

1 economic study (PEA, pre-feasibility or feasibility) published by Rio2 Limited, read by Mining News Terminal. Base case after-tax figures; a study repeated in later releases is listed once.

StudyProjectDateAfter-tax NPVIRRInitial capexMine lifeRelease
StudyCondestable Mine2026-06-23US$710M @8%——14 yrsRIO2 Updates Condestable MINE Resources & Reserves

Rio2 Limited production results

Production, guidance and milestones Rio2 Limited has reported, read by Mining News Terminal. A figure repeated in later releases is listed once.

Guidance

PeriodMetalGuidanceMineRelease
FY 2026Gold60,000–65,000 oz—2026-05-15

Production

PeriodMetalProducedSoldAISCMineRelease
Q1 2026Silver49,198 oz———2026-05-15
Q1 2026Gold7,849 oz6,654 oz——2026-05-15
Q1 2026Copper6,403,188 lb6,204,313 lb——2026-05-15

Rio2 Limited royalties and streams

Royalty and stream deals Rio2 Limited has announced, read by Mining News Terminal. A deal reported in several releases is listed once.

DateInterestPropertyDealBuyerSellerPrice
2022-11-221.5% RoyaltyAnocarireNew / granted, agreedOsisko Gold Royalties—US$5M

Rio2 Limited NI 43-101 technical reports

NI 43-101 technical reports Rio2 Limited has commissioned, filed or withdrawn, read by Mining News Terminal. A report mentioned in several releases is listed once.

DateReportProjectDatesAuthors
2026-07-23Property report, filedCondestable Mineeffective 2026-05-31, filed 2026-07-23SLR Consulting
2026-07-14Property report, filedKalzas Tungsten Projecteffective 2026-06-19, filed 2026-07-14RUMI Geoscience Co
2026-06-23Resource estimate, commissionedCondestable Mineeffective 2022-12-31, expected within 45 daysSLR Consulting
2025-12-11Property report, filedCondestable Mineeffective 2022-12-31, filed 2025-12-11—
2025-12-08Technical report, commissionedCondestable Mineeffective 2022-12-31SLR Consulting
2023-10-18Feasibility, filedFenix Gold Projecteffective 2023-10-16, filed 2023-10-18Mining Plus; Peru

Rio2 Limited permits and approvals

Permits and government approvals Rio2 Limited has planned, applied for, received or had contested, read by Mining News Terminal. A permit reported in several releases is listed once, at its latest stage.

DatePermitProjectAuthority
2026-08-25Environmental assessment, grantedCondestable Mine—
2024-10-02Construction / operating, grantedFenix Gold Mine—
2022-07-05Environmental assessment, grantedRIO2'S Fenix Gold Project—

Related lists

Browse MineTerminal Pro

Explore mining stocks: Gold stocks Copper stocks Silver stocks Lithium stocks Uranium stocks Nickel stocks Canada British Columbia United States Ontario Quebec Insider buying Top drill results All lists