Tully Gold Project
Project of Loyalist Exploration Limited (PNGC)
- StagePEA
- LocationOntario, Canada
- CommoditiesGold
- Operating permitMine permit (planned), 2026-07-07
- News releases12
- Reported2025-04-09 – 2026-10-19
- Also calledTully, Tully Gold, Tully Property
Tully Gold Project as reported in Loyalist Exploration Limited’s news releases, read by Mining News Terminal. Each row links to its release.
Resource estimates
| Date | Category | Estimate | Type |
|---|
| 2026-10-19 | Indicated | 1.62 Mt @ 3.16 g/t Au for 164 koz Au | — |
| 2026-10-19 | Inferred | 950 kt @ 2.03 g/t Au for 62 koz Au | — |
| 2026-09-28 | Indicated | 1.62 Mt @ 3.16 g/t Au for 164 koz Au | — |
| 2026-09-08 | Indicated | 1.62 Mt @ 3.16 g/t Au | — |
| 2026-09-08 | Inferred | 950 kt @ 2.03 g/t Au | — |
| 2026-08-21 | Indicated | 1.62 Mt @ 3.16 g/t Au for 164 koz Au | Restated |
| 2026-08-21 | Inferred | 950 kt @ 2.03 g/t Au for 62 koz Au | Restated |
| 2026-07-07 | Indicated | 1.62 Mt @ 1.1 g/t Au, 3.16 g/t Au for 164 koz Au | Update |
| 2026-07-07 | Inferred | 948 kt @ 1.1 g/t Au, 2.03 g/t Au for 62 koz Au | Update |
| 2026-06-02 | Indicated | 358 kt @ 6.56 g/t Au for 76 koz Au | Update |
| 2026-06-02 | Inferred | 184 kt @ 5.17 g/t Au for 31 koz Au | Update |
| 2026-04-16 | Indicated | 358 kt @ 6.56 g/t Au for 76 koz Au | — |
| 2026-04-16 | Inferred | 184 kt @ 5.17 g/t Au for 31 koz Au | — |
Exploration programs
| Date | Program | Size | Method and metal |
|---|
| 2026-07-21 | drilling, completed | — | gold, lead |
| 2026-06-02 | drilling, completed | 70 holes | diamond · gold |
Permits
Land deals
Royalties and streams
| Date | Royalty | Holder | Status |
|---|
| 2025-10-03 | NSR 2% | Loyalist Exploration | closed |
NI 43-101 technical reports
News timeline
| Date | Headline |
|---|
| 2026-10-19 | Loyalist Exploration Discloses Grade-Tonnage Sensitivity for Tully Gold Project Mineral Resource Estimate |
| 2026-09-28 | Loyalist Exploration Engages trajectorE Engineering Inc. as Owner's Engineer, with J. Dean Thibault as Lead Technical Advisor, for Process Flowsheet Development from Mining to Doré Bar Production |
| 2026-09-08 | Loyalist Commences Preliminary Economic Assessment on the Tully Gold Project, Timmins, Ontario |
| 2026-08-21 | Loyalist Files 2026 Mineral Resource Estimate Of 1.62 MT Indicated At 3.16 G/T AU (164,000 OZ) And 0.95 MT Inferred At 2.03 G/T AU (62,000 OZ) At The Tully Gold Project, Timmins, Ontario |
| 2026-07-21 | Loyalist Announces Len Mackenzie as Vice-President Exploration |
| 2026-07-07 | LOYALIST ANNOUNCES UPDATED 2026 MINERAL RESOURCE ESTIMATE AT THE TULLY GOLD PROJECT: 1.62 MT INDICATED AT 3.16 G/T AU (164,000 OZ) AND 0.95 MT INFERRED AT 2.03 G/T AU (62,000 OZ), TIMMINS, ONTARIO |
| 2026-06-02 | Loyalist Announces Exploration Thesis at the Tully Gold Project - Expansion East, West and at Depth |
| 2026-04-16 | Loyalist Exploration Limited Engages P&E Mining Consultants Inc. for Mineral Resource Estimate and Preliminary Economic Assessment on the Tully Gold Project, Timmins, Ontario |
| 2025-10-03 | Loyalist Exploration Acquires Tully Property, Boosting Timmins Gold Portfolio and Announces Closing of $653,000 First Tranche of Non- Brokered Financing |
| 2025-09-29 | Loyalist Exploration Update on Acquisition of the Tully Gold Project |
| 2025-09-18 | Loyalist Exploration Announces Non-Brokered Private Placement to Acquire Tully Gold Project |
| 2025-04-09 | Loyalist Exploration and Fulcrum Metals Announce Letter of Intent for Major Gold Property Acquisition in the Timmins Mining District and Upsize to Non-brokered Private Placement |