Log In

Don't have an account? Sign up

Magna Mining Inc (NICU) Mining Data

TSX: NICU · Copper, Nickel · Production stage

Magna Mining Inc mineral properties

No mineral properties are on file for this company yet.

Magna Mining Inc drill result releases

21 drill result releases from Magna Mining Inc, read by Mining News Terminal, newest first.

DateCompanyProjectHoleBest interceptIntervalsRelease
2026-09-17Magna Mining Inc (NICU)LevackFNX2038A-W123.5% CuEq / 2.1m340Magna Mining Expands the R2 Footwall Zone and Intersects
2026-06-22Magna Mining Inc (NICU)LevackMLV-26-14A29.7% CuEq / 3.4m48Magna Mining Intersects 29.7% Copper Equivalent over 3.4
2026-04-14Magna Mining Inc (NICU)LevackFNX6083-W55.7% Cu / 0.4m30Magna Mining Intersects 23.2% Copper, 5.6% Nickel, 21.4 g/t Platinum + Palladium + Gold, and 225.0 g/t Silver over 2.4 metres and Provides an Update on Progress at the Levack Mine in Sudbury, Ontario
2026-02-18Magna Mining Inc (NICU)LevackFNX6070-W15.7% Cu / 1.1m46Magna Mining Announces Additional Footwall Drill Results from the Levack Mine in Sudbury, Ontario
2025-12-09Magna Mining Inc (NICU)LevackFNX2026-W225% Cu / 0.4m39Magna Mining Continues to Intersect Copper and Precious Metal Bearing Veins in Multiple Drill Holes at Levack Mine’s R2 Target in Sudbury, Including 25.0% Copper, 34.7 g/t Pt+Pd+Au, and 151 g/t Silver over 0.4 metres
2025-10-23Magna Mining Inc (NICU)LevackFNX6083-W219.27% Cu / 0.51m159Magna Mining Reports Multiple Copper, Nickel and Precious Metal Rich Intersections from the R2 Target at the Levack Mine in Sudbury, Ontario
2025-08-28Magna Mining Inc (NICU)LevackFNX6083-W129.2% Cu / 1m17Magna Mining Intersects 29.2% Cu, 0.9% Ni, 53.0 g/t Pt + Pd + Au Over 1.0 Metre, 140 Metres Downdip of Previous Intersection Below the No. 3 Zone at the Levack Mine in Sudbury, Ontario
2025-08-19Magna Mining Inc (NICU)LevackMLV-25-212.3% Ni / 28m21Magna Mining Intersects Near Surface Contact Nickel Mineralization Grading 2.3% Ni, 0.7% Cu Over 28.0 metres at the Levack Mine
2025-08-06Magna Mining Inc (NICU)McCreedy WestMMW-25-11917.9% Cu / 1.8m18Magna Mining Reports 17.9% Cu, 0.6% Ni and 28.1 g/t Pt + Pd + Au over 1.8 Metres in the 700 Footwall Copper Zone at McCreedy West Mine
2025-07-09Magna Mining Inc (NICU)LevackMLV-25-14A2.6% Cu / 0.6m27Magna Mining Continues to Intersect High Grade Mineralization, Including 2.6% Cu, 8.1% Ni, 17.8 g/t Pt + Pd + Au over 0.6m in the Footwall Beneath the Levack No. 3 Orebody
2025-06-10Magna Mining Inc (NICU)McCreedy WestFNX333502% Cu / 20m24Magna Mining Announces New Drill Results from McCreedy West and Recognition from the Government of Ontario
2025-04-30Magna Mining Inc (NICU)LevackMLV-25-0424% Cu / 2m21Magna Mining Intersects 24.0% Cu, 1.2% Ni & 6.7 g/t Pt + Pd + Au over 2.0 Metres at Levack Mine Additional Infill Drilling at the McCreedy West Mine Continues to Return High-Grade Copper Intersections
2025-03-31Magna Mining Inc (NICU)LevackMLV-25-0124.9% Cu / 1.6m21Magna Mining Announces Assay Results and Provides an Update on the McCreedy West Mine Assay Results Include 24.9% Cu, 0.4% Ni & 5.0 g/t Pt + Pd + Au Over 1.6 Metres at Levack Mine
2025-03-03Magna Mining Inc (NICU)LevackFNX3322314.3% Cu / 9.6m18Magna Mining Initiates Diamond Drilling at the Levack Mine and Reports 2024 Drilling Results at the McCreedy West Mine Drilling results include 14.3% Cu, 3.5% Ni, 6.0 g/t Pt+Pd+Au over 9.6 metres.
2024-11-04Magna Mining Inc (NICU)ShakespeareMSW-24-012.29% Cu / 13.9m7Magna Mining Discovers New Copper Zone at the Shakespeare Project First Drillhole on the SW Copper Showing Intersects 2.3% Cu Over 13.9 Metres
2024-07-08Magna Mining Inc (NICU)Crean HillMCR-24-0875% Cu / 15.2m12Magna Mining Reports High Grade Copper Results from the Crean Hill Project and Commences Surface Advanced Exploration Results Include 5.0% Cu, 0.7% Ni, and 12.8 g/t Pt+Pd+Au Over 15.2 Metres
2024-05-08Magna Mining Inc (NICU)FootwallMCB-24-0290.93% Ni / 6.33m113MAGNA MINING REPORTS DIAMOND DRILLING RESULTS FROM THE 109 FOOTWALL ZONE SURFACE BULK SAMPLE AREA Results include 0.9% Ni, 2.9% Cu, and 9.5 g/t Pt+Pd+Au over 6.3 metres, starting at surface
2024-04-03Magna Mining Inc (NICU)FootwallMCR-24-0702.54% Ni / 6.8m108Magna Mining Continues to Intersect High Grade Massive Sulphide Within the Core of the 109 Footwall Zone, Including 2.5% Ni, 9.6% Cu, and 17.4 g/t Pt+Pd+Au over 6.8 Metres
2024-02-20Magna Mining Inc (NICU)FWMCR-24-0601.11% Ni / 3m123Magna Mining Provides First 2024 Drilling Results, Including 1.1% Ni, 8.3% Cu, and 13.9 g/t Pt+Pd+Au over 3.0 Metres
2023-11-03Magna Mining Inc (NICU)Crean HillMCR-23-52A0.8% Ni / 96.5m167Magna Mining Provides Exploration Update
2023-09-21Magna Mining Inc (NICU)Crean HillMCR-23-0465% NiEq / 7m146Magna Mining Intersects 5% Nickel Equivalent over 7 Metres in the 105 Footwall Zone at Crean Hill

Magna Mining Inc economic studies

5 economic studies (PEA, pre-feasibility or feasibility) published by Magna Mining Inc, read by Mining News Terminal. Base case after-tax figures; a study repeated in later releases is listed once.

StudyProjectDateAfter-tax NPVIRRInitial capexMine lifeRelease
PFSCrean Hill2026-10-21C$257M @7%43.4%C$127M12 yrsMagna Mining Reports Results of Crean Hill Pre-Feasibility Study With Construction to Begin in 2027
PEALevack Mine2026-10-08C$232M @7%92.4%C$70.1M—Magna Mining Reports Results of Levack Mine Preliminary Economic Assessment and Approves Restart of Production
PEACrean Hill2024-09-17C$194M @8%129%C$27.7M13 yrsNotice of Correction to News Release Dated September 17, 2024, Regarding Updated Crean Hill PEA
PEACrean Hill2023-07-31C$230M @8%23.4%—15 yrsMagna Mining Completes Preliminary Economic Assessment on the Crean Hill Project Study Demonstrates Base Case 15 Year Mine Life and Significant Potential Synergies with the Shakespeare Project
FSShakespeare Nickel2022-01-31C$221M @6%21.5%C$233M7.1 yrsMagna Mining Inc's Shakespeare Nickel Project Feasibility Study Demonstrates Positive Economics and Carbon Neutral Nickel Mining Operation

Magna Mining Inc production results

Production, guidance and milestones Magna Mining Inc has reported, read by Mining News Terminal. A figure repeated in later releases is listed once.

Production

PeriodMetalProducedSoldAISCMineRelease
Q2 2026Nickel270,000 lb———2026-08-12
Q2 2026Copper2,600,000 lb———2026-08-12
Q1 2026Nickel240,000 lb———2026-05-27
Q1 2026Copper2,000,000 lb———2026-05-27
FY 2025Nickel900,000 lb———2026-04-20
Q4 2025Nickel240,000 lb———2026-04-20
FY 2025Copper6,100,000 lb———2026-04-20
Q4 2025Copper1,910,000 lb———2026-04-20
Q3 2025Nickel200,000 lb———2025-11-25
Q3 2025Copper1,950,000 lb———2025-11-25
Q2 2025Copper3,050,000 lb———2025-08-27
Q1 2025Copper790,000 lb———2025-05-29

Magna Mining Inc exploration programs

Drilling, geophysics and ground programs Magna Mining Inc has announced, read by Mining News Terminal. A program reported in several releases is listed once, from the latest.

DateProgramProjectSizeMethod and metal
2026-09-17Drilling, plannedLevack—diamond - Ni, Cu, PGE, Au
2026-09-17Drilling, plannedLevack—Cu, PGE, Au, Ag
2026-09-17Drilling, underwayLevack—diamond
2026-09-17Drilling, underwayLevack—diamond - Cu, Ni, PGE, Au, Ag
2026-09-17Drilling, underwayLevack—diamond - Ni, Cu, PGE, Au
2026-09-17Drilling, underwayLevack—diamond - Ni, Cu, PGE
2026-09-17Drilling, underwayLevack—diamond - Cu, Ni, PGE, Au, Ag
2026-06-22Drilling, underwayLevack—diamond - copper, nickel, platinum, palladium, gold, silver
2026-06-22Drilling, underwayLevack14 holesdiamond - copper, nickel, platinum, palladium, gold, silver

Magna Mining Inc NI 43-101 technical reports

NI 43-101 technical reports Magna Mining Inc has commissioned, filed or withdrawn, read by Mining News Terminal. A report mentioned in several releases is listed once.

DateReportProjectDatesAuthors
2026-10-21Pre-feasibility, commissionedCrean Hill Projecteffective 2026-04-15, expected within 45 daysSGS Geological Services
2026-10-08PEA, commissionedLevack Mineexpected within 45 daysAGP Mining Consultants; Orix Geoscience
2026-05-27Pre-feasibility, commissionedLevack Mineexpected in Q3 2026—

Magna Mining Inc permits and approvals

Permits and government approvals Magna Mining Inc has planned, applied for, received or had contested, read by Mining News Terminal. A permit reported in several releases is listed once, at its latest stage.

DatePermitProjectAuthority
2024-03-04Other, grantedCrean Hill ProjectOntario Ministry of Mines

Magna Mining Inc property options, earn-ins and staking

Mineral property options, earn-ins, staking, and claim and property purchases and sales Magna Mining Inc has announced, read by Mining News Terminal. A deal reported in several releases is listed once, at its latest stage.

DateDealPropertyOther partyInterest
2025-07-21Property purchase, completedNorthX PropertyNorthX Nickel100%
2024-12-18Property purchase, signedSudbury PropertiesNorthX Nickel100%
2024-09-12Property purchase, signedCrean HillKGHM International100%

Related lists

Browse MineTerminal Pro

Explore mining stocks: Gold stocks Copper stocks Silver stocks Lithium stocks Uranium stocks Nickel stocks Canada British Columbia United States Ontario Quebec Insider buying Top drill results All lists