Log In

Don't have an account? Sign up

NextSource Materials Inc. (NEXT) Mining Data

TSX: NEXT · Graphite · Production stage

NextSource Materials Inc. mineral properties

No mineral properties are on file for this company yet.

NextSource Materials Inc. economic studies

10 economic studies (PEA, pre-feasibility or feasibility) published by NextSource Materials Inc.. Base case after-tax figures; a study repeated in later releases is listed once.

StudyProjectDateAfter-tax NPVIRRInitial capexMine lifeRelease
FSMolo Mine2026-07-27US$348M @8%20%US$291M37 yrsNextSource Materials Announces Updated Feasibility Study Results for Molo Mine Expansion to 150k tpa of SuperFlake® Graphite Concentrate
StudyUAE Battery Anode Facility2025-10-01US$442M @8%24%US$291M33 yrsNextSource Materials Announces Positive Results of Technical & Economic Study for Proposed Battery Anode Facility in the UAE and Secures Industrial Site with Building in Abu Dhabi
StudySaudi Arabia Battery Anode Facility2024-06-27US$677M @8%20.3%US$280M—NextSource Materials Announces Global Anode Expansion Strategy Update, Economic Results of Proposed Battery Anode Facility in Saudi Arabia, and Strategic Partner Process
FSMolo Graphite Mine2024-06-13—29%US$162M—NextSource Materials Signs Mandate Letter for US$91 Million Debt Facility with International Finance Corporation
FSMolo Mine2023-12-12US$370M @8%29%US$162M25 yrsNextSource Materials Announces Robust Feasibility Study Results for Molo Mine Expansion to 150,000 Tonnes per Annum of SuperFlake® Graphite Concentrate
StudyFirst Battery Anode Facility2023-02-28US$107M @8%42.7%US$23.5M30 yrsNextSource Materials Announces Global Anode Expansion Strategy and Economic Results of First Battery Anode Facility
PEAMolo Graphite Mine2022-04-28US$593M @8%31.4%US$156M26 yrsNextSource Materials Announces Initiation of Civil Works and Shipment of Buildings to the Molo Graphite Mine Site in Madagascar and Filing of Updated PEA
PEAMolo Graphite Mine2022-02-28US$613M @8%32%US$156M26 yrsNextSource Materials Announces Preliminary Economic Assessment for a Mine Expansion of 150,000 Tonnes per Annum of SuperFlake® Graphite Concentrate
FSMolo Graphite2019-09-27US$184M @8%36.2%US$60.1M30 yrsNextSource Materials Releases New Feasibility Study Incorporating Phased Buildout in Preparation of Mine Financing
FSMolo Graphite Mine2017-06-01US$25.5M @8%21.6%—30 yrsNextSource Materials Inc. Announces Positive Updated Feasibility Study for Phase 1 Modular Mine Production of 17,000 Tonnes Per Year

NextSource Materials Inc. production results

Production, guidance and milestones NextSource Materials Inc. has reported. A figure repeated in later releases is listed once.

Milestones

NextSource Materials Inc. NI 43-101 technical reports

NI 43-101 technical reports NextSource Materials Inc. has commissioned, filed or withdrawn. A report mentioned in several releases is listed once.

DateReportProjectDatesAuthors
2026-07-27Feasibility, commissionedMolo Mineexpected within 45 daysSGS Canada Metallurgical Services
2024-04-10PEA, commissionedMolo Graphite Mine—Erudite Strategies; SGS Canada Metallurgical Services
2023-12-12Feasibility, commissionedMolo Mineeffective 2023-09-01, expected within 45 daysErudite Strategies

Related lists

Browse MineTerminal Pro

Explore mining stocks: Gold stocks Copper stocks Silver stocks Lithium stocks Uranium stocks Nickel stocks Canada United States British Columbia Ontario Quebec Insider buying Top drill results All lists