Log In

Don't have an account? Sign up

Ivanhoe Electric Inc. (IE) Mining Data

TSX: IE · Copper · Advanced Exploration stage

Ivanhoe Electric Inc. mineral properties

No mineral properties are on file for this company yet.

Ivanhoe Electric Inc. drill result releases

1 drill result release from Ivanhoe Electric Inc., read by Mining News Terminal, newest first.

Ivanhoe Electric Inc. economic studies

4 economic studies (PEA, pre-feasibility or feasibility) published by Ivanhoe Electric Inc., read by Mining News Terminal. Base case after-tax figures; a study repeated in later releases is listed once.

StudyProjectDateAfter-tax NPVIRRInitial capexMine lifeRelease
PFSSanta Cruz Copper2026-09-23US$3.5B @8%30%US$1.43B15 yrs2026 Preliminary Feasibility Study for the Santa Cruz Copper Project in Arizona Confirms High-Grade, Low-Cost Project with Strong Economics Initial Capital of $1.43 Billion and Cash Operating Costs of $1.47 Per Pound of Copper Result in an After-Tax Net Present
PFSSanta Cruz Copper2025-06-23C$1.9B @8%24%C$1.24B23 yrsIvanhoe Electric’s Preliminary Feasibility Study for the Santa Cruz Copper Project in Arizona Defines a High-Quality Underground Mining Operation with Strong Economics Advanced United States Copper Project on Private Land with
PEASamapleu-Grata Nickel-Copper-Platinum-Palladium-Gold2024-03-25US$257M @8%22.3%US$338M16 yrsIvanhoe Electric Announces Completion of Earn-In to Acquire a 60% Interest in the Samapleu-Grata Nickel-Copper-Platinum-Palladium-Gold Project in the Ivory Coast Joint Venture Partner Sama Resources Announced a New Preliminary Economic Assessment for the Project Delivering a Pre-
StudySanta Cruz Copper2023-09-06C$1.32B @8%23%C$1.15B20 yrsIvanhoe Electric Announces Completion of the Initial Assessment for the Santa Cruz Copper Project in Arizona The Initial Assessment Focuses on a Small Surface Footprint, 5.9 Million Tonnes per Year High Grade Underground Copper Mining

Ivanhoe Electric Inc. NI 43-101 technical reports

NI 43-101 technical reports Ivanhoe Electric Inc. has commissioned, filed or withdrawn, read by Mining News Terminal. A report mentioned in several releases is listed once.

DateReportProjectDatesAuthors
2026-09-23Pre-feasibility, commissionedSanta Cruz Copper Projectexpected within 45 daysBBA Consultants; Worley Group; Met Engineering; Stantec; Tetra Tech

Ivanhoe Electric Inc. property options, earn-ins and staking

Mineral property options, earn-ins, staking, and claim and property purchases and sales Ivanhoe Electric Inc. has announced, read by Mining News Terminal. A deal reported in several releases is listed once, at its latest stage.

DateDealPropertyOther partyInterest
2026-03-13Property sale, payment madeAlacránVeritas Resources50%
2025-11-19Property purchase, completedSanta CruzWolff-Harvard Ventures100%
2024-08-13Option in / earn-in, completedSanta Cruz—100%
2024-03-25Option out, proposed (loi)Samapleu-GrataEstimated Initial Capital60%

Related lists

Browse MineTerminal Pro

Explore mining stocks: Gold stocks Copper stocks Silver stocks Lithium stocks Uranium stocks Nickel stocks Canada British Columbia Ontario United States Quebec Insider buying Top drill results All lists