Log In

Don't have an account? Sign up

Avino Silver & Gold Mines Ltd. (ASM) Mining Data

TSX: ASM · Silver, Gold, Copper · Production stage

Avino Silver & Gold Mines Ltd. mineral properties

No mineral properties are on file for this company yet.

Avino Silver & Gold Mines Ltd. drill result releases

4 drill result releases from Avino Silver & Gold Mines Ltd., newest first.

Avino Silver & Gold Mines Ltd. economic studies

4 economic studies (PEA, pre-feasibility or feasibility) published by Avino Silver & Gold Mines Ltd.. Base case after-tax figures; a study repeated in later releases is listed once.

StudyProjectDateAfter-tax NPVIRRInitial capexMine lifeRelease
PFSOxide Tailings2024-02-05US$61M @5%26%US$49.1M9 yrsAvino Reports Oxide Tailings Project Prefeasibility Study with After-Tax NPV of US$61 Million and 26% IRR
PEAAvino Property2017-05-29US$22.2M @8%32%US$28.5M7 yrsAvino Files Technical Report on SEDAR
PEAAvino Property2017-04-11US$22.2M @8%32%US$24.4M7 yrsAvino Announces Updated Positive Preliminary Economic Assessment for the ‘Oxide Tailings’: Base Case Pre-Tax NPV (8%) of US$40.5 Million and a 48.4% IRR
PEAAvino Property2016-06-13C$38.6M54%——Avino Reports New Power Line Energized and Final Permits Received for New Tailings Storage Facility

Avino Silver & Gold Mines Ltd. production results

Production, guidance and milestones Avino Silver & Gold Mines Ltd. has reported. A figure repeated in later releases is listed once.

Guidance

PeriodMetalGuidanceMineRelease
FY 2026AgEq2,200,000–2,500,000 oz—2026-11-04
FY 2026Silver1,000,000–1,200,000 oz—2026-02-19
FY 2026Gold5,000–7,000 oz—2026-02-19

Production

PeriodMetalProducedSoldAISCMineRelease
Q3 2026Silver303,189 oz—$35/oz—2026-11-04
Q3 2026Gold1,732 oz———2026-11-04
Q3 2026Gold equiv.582,836 oz———2026-11-04
Q3 2026Copper1,202,821 lb———2026-10-15
Q3 2026Ageq582,836 oz—$35/oz—2026-10-15
Q2 2026Silver267,305 oz—$39/oz—2026-08-12
Q2 2026Gold2,178 oz———2026-08-12
Q2 2026Copper729,929 lb———2026-08-12
Q2 2026AgEq534,945 oz—$39/oz—2026-08-12
H1 2026Silver530,362 oz—$37/oz—2026-07-22
H1 2026Gold4,029 oz———2026-07-22
H1 2026Copper2,073,583 lb———2026-07-22

Avino Silver & Gold Mines Ltd. exploration programs

Drilling, geophysics and ground programs Avino Silver & Gold Mines Ltd. has announced. A program reported in several releases is listed once, from the latest.

DateProgramProjectSizeMethod and metal
2026-11-04Drilling, completedAvino (2026)10,675 mgold, silver
2026-10-26Drilling, underwayLa Preciosa (2026)15,000 msilver, gold
2026-10-26Drilling, completedLa Preciosa (2026)3,300 m, 13 holessilver, gold

Avino Silver & Gold Mines Ltd. NI 43-101 technical reports

NI 43-101 technical reports Avino Silver & Gold Mines Ltd. has commissioned, filed or withdrawn. A report mentioned in several releases is listed once.

DateReportProjectDatesAuthors
2026-04-23Resource estimate, commissionedAvino Propertyeffective 2025-10-31, expected within 45 daysTetra Tech Canada
2024-02-05Pre-feasibility, commissionedOxide Tailings Projecteffective 2023-10-16, expected within 45 daysTetra Tech Canada

Related lists

Browse MineTerminal Pro

Explore mining stocks: Gold stocks Copper stocks Silver stocks Lithium stocks Uranium stocks Nickel stocks Canada United States British Columbia Ontario Quebec Insider buying Top drill results All lists